Welcome to ICP Alltek

Application

Spray Application PlasterAdvantage of Conventional Spray over Airless is the simplicity and robustness of the equipment with minimum of maintenance required and with the ability to spray material of all types including such that contains “grits” or particles of sizes up to 3 mm.

Procedure
The Alltek materials are delivered in standard 25 kilo plastic bags as a paste completely ready to use. 40 bags (1000 kilo) are placed on a standard EURO pallet for easy handling by forklift. The plastic bags are practical packing for when using the spray application method. Alltek can also be supplied in 10 or 15 liter plastic buckets suitable for hand application to smaller areas, single rooms or smaller apartments as a preparations coat before final decoration with emulsion paint.

Material consumption over fairfaced concrete, when applied in two coats, is normally between 1,5 - 2,5 kilo per m2, depending on quality of concrete and skill of the applicator.

Several different grades of Alltek are available, below is a short summary of the most common or see our product specifications:

  1. ALLTEK UNIVERSAL (Red Label) Is a white product based on fined graded marble powder and suitable for application in two coats as a leveling/surfacing material to interior walls and ceilings of fairfaced concrete, lime/cement plaster, plasterboard and similar surfaces prior to painting. Alltek can be applied as a smooth finish or alternatively, sprayed as a decorative texture in which case ceilings would not need any further decoration/over painting.
  2. ALLTEK VIOLET (Violet Label) Similar to above but with added binder for a harder and more resilient surface. - Extensively used when booth walls and ceilings are to be left as a textured finish. - Typical users are the ACCOR Hotel Group in France and Internationally.
  3. ALLTEK Superfine (Orange label) A very fine graded white material (<100 micron) to be used when extra smooth surfaces are required. This material is then normally applied as a second coat over the CACHET RED

 

 
2009-01-06

Latest News

January 2008
A new plant with capacity of 6000 tons/year is underconstruction in Algeria and shall be in production end of March this year

December 2007
Marketing Agreement has been signed with a company by name of ANIVA in Zedar Croatia

November 2007
A seminar was held in Romania and agreement signed by locally established "Alltek Construct SRL"

October 2007
All UK market increased to 700 tons in 2007. Alltek is now under re-organisation to strengthen our marketing position

September 2007
EU-CE approval for our new lower density plaster-board joint filler has been obtained

August 2007
Construction has started at the ICP mainplant, Lagnieu, France of new 1850 m2 ALLTEK warehouse & distribution centre

View the new Alltek Video online today!

© International Coating Products SARL, April 4, 2006  
Back to the Home Page